Water infrastructure including pumping station reconstruction AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Procurement object

  • Procurement title: Reconstruction of water infrastructure including pumping station.
  • Objective: Reconstruction and optimization of the factory’s water pumping station, water treatment circuit, and fire water system on a turnkey basis.
  • Technical requirements:
    • Maximum daily throughput: 275 m³/24h.
    • Raw water buffer tanks: 2 x 15 m³.
    • Treated water buffer tanks: 2 x 40 m³.
    • Peak capacity of the second-stage pump group: 120 m³/h.
    • System automation…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

312231_hindamiskriteeriumid.pdf

312231_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

312231_vastavustingimused.pdf

312231.zip

Kohaliku-ettevotlustaristu-ehitustoode-hinnapakkumuse-vormV.xls

Lihtskeem vee liikumine_seadmete paigutus.png

Veetöötluse Hanke Tehniline Spetsifikatsioon.docx

Ready to get started?

Subscribe and enjoy all the benefits every day!