Construction works for a stormwater drainage pipeline overflow at Paldiski mnt 227c AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Procurement Object

  • Goal: Construction of an overflow for the DN1000 concrete stormwater collector passing through the Paldiski mnt 227c property, from the chamber to be reconstructed (No. 40447) to the Järveotsa stream.
  • Key technical works:
    • Construction of a stormwater drainage pipeline (PN10 HDPE de500, approx. 8m) including a backflow preventer.
    • Construction of a stormwater ditch (approx. 7m) and rock reinforcement (approx. 39 m2).
    • Demolition of the existing concrete chamber…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

313045_alltoovotjate_kontrollimise_tingimused.pdf

313045_hindamiskriteeriumid.pdf

313045_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

313045_vastavustingimused.pdf

313045.zip

Lisa 1 Tehniline kirjeldus_Paldiski mnt 227c ülevool.docx

Lisa 2 Pakkumuse maksumuse vorm_Paldiski mnt 227c ülevoolu ehitustööd.xlsx

Lisad 3-7/Lisa 3 Töötervishoiu, -ohutuse- ja keskkonnanõuded TVESI objektidel 25.05.2026.pdf

Lisad 3-7/Lisa 5 Leppetrahvi määramise akti vorm.docx

Lisad 3-7/Lisad 4, 6 ja 7.xlsx

Lisad 3-7.zip

Nõusolek vahenditele tuginemiseks.docx

Toruehituse töövõtuleping.docx

Ühispakkujate volikiri.docx

Väikehanke pakkumuse esitamise ettepanek (RHR hange).docx

Ready to get started?

Subscribe and enjoy all the benefits every day!