Here is a summary of the current information based on the provided procurement documents:
Subject of procurement
What is being purchased: Repair works for children’s playground surfacing.
Key technical requirements:
Disassemble the existing rubber tile surfacing.
Install poured surfacing: at least 30 mm of SBR granules and at least 10 mm of EPDM granules (the mixture must consist of 70% green and 30% red rubber granules).