  • Purpose: Complete modernization of the depreciated equipment of the Metsalao substation (Voldi tee 9, Tabivere small town, Tartu parish) located on the premises of Mayeri Industries AS using a “turnkey” method.
  • Technical requirements:
    • Stage I (2nd floor): Reconstruction of the medium-voltage switchgear (preferably Schneider Electric RM6 or equivalent, 15 kV, capacity up to 9 MW, two-section system).
    • Stage II (1st floor): Reconstruction of the low-voltage switchgear…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

312059_hindamiskriteeriumid.pdf

312059_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

312059_vastavustingimused.pdf

312059.zip

ajaam päiksepargi kõrval.jpg

Alajaama rekonstrueerimise tehniline kirjeldus.docx

Ehituse_hinnapakkumuse_vorm.xlsx

II_korrus_metsalao_P.jpg

I_korrus_metsalao_P.jpg