Design of the reconstruction of the pressure pipelines for the 1st stage pumping station of the Ülemiste water treatment plant AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Subject of the procurement

  • Goal: Design of the reconstruction of the pressure pipelines for the 1st stage pumping station of the Ülemiste water treatment plant (at the main project stage).
  • Technical requirements:
    • Replacement of the 1st stage pumping station pressure pipelines in the microfilter building.
    • Replacement of the technological pressure pipelines (2 units) to the A and B production buildings.
    • Design of the raw water piping for the floaters…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

311547_hindamiskriteeriumid.pdf

311547_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

311547_vastavustingimused.pdf

311547.zip

Lisa 1 Projekteerimislepingu üldtingimused.pdf

Lisa 4 Üleandmise-vastuvõtmise akti vorm.docx

Lisa 5 Leppetrahvi määramise akti vorm (projekteerimine).docx

Pakkumuse maksumuse vorm_VPJ 1 astme pumpla.xlsx

Projekteerimise töövõtuleping.docx

Tehniline kirjeldus_I astme pumpla survetrasside proj.docx

Väikehanke pakkumuse esitamise ettepanek (RHR hange).docx

Ready to get started?

Subscribe and enjoy all the benefits every day!