Replacement of 110 kV overhead line insulators at Muuga Harbour AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Subject of the procurement

  • Object: Replacement of 110 kV overhead line insulators at Muuga Harbour, including supply, dismantling, and disposal of insulators.
  • Technical requirements: The work must comply with Elering AS technical requirements for transmission line construction (series “700”). Among other things, bird deterrents must be installed, vibration dampers replaced, crossings brought into compliance with requirements, openings in metal masts closed, and required markings installed.
  • Location: Muuga Harbour (EE001).

Contract…

 
To see full summary, please log in or register.

t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

110 kV_liini_skeem.dwg

110 kV_liini_skeem-model.pdf

311212_hindamiskriteeriumid.pdf

311212_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

311212_vastavustingimused.pdf

311212.zip

Eetika_pohimotted_partneritele (HL lisa 3).pdf

Lisa 1 Tehniline kirjeldus.pdf

Lisa 2 Hankelepingu projekt.pdf

Lisa 3 Teise isiku (alltöövõtja) nõusolek kvalifitseerimistingimustele tuginemisel.docx

Lisa 4 Ühispakkujate volikiri.docx

Pakkumuse esitamise ettepanek.pdf

Tehnilise kirjelduse lisad 1 ja 2.zip

Ready to get started?

Subscribe and enjoy all the benefits every day!