RECONSTRUCTION OF ŽEIMIŲ TAKO ST. IN JONAVA, JONAVA DISTRICT MUNICIPALITY, INCLUDING THE INSTALLATION OF PEDESTRIAN-BICYCLE PATHS AND STORM SEWER NETWORKS AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Procurement Object

  • Scope: Complex works: preparation of the work design, construction works, preparation of as-built geodetic surveys, and preparation of documents for the registration of structures.
  • Main Technical Requirements: Installation of pedestrian and bicycle paths, construction of storm sewer networks (d200–d500 mm) and drainage, directional lighting (LED, RF controllers, motion sensors), landscaping.
  • Geographic Coverage: Žeimių tako St., Jonava, Jonava District Municipality.

Contract Terms

  • Contract Duration: 26 months.
  • Warranties:
     
    To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

01. UL-24-0150-TP-BD.pdf

02. UL-24-0150-TP-S.pdf

03. UL-24-0150-TP-VN.pdf

04. UL-24-0150-12-TP-E.pdf

05. UL-24-0150-13-TP-ER.pdf

06. UL-24-0150-TP-SO.pdf

Atviro konkurso bendrosios 11-25 paskelbimui (4)(1).docx

c4t_8106908_1.xml

espd-request(11).zip

espd-request.pdf

espd-request.xml

pirkimo dokumentai.zip

projektas skelbimui.zip

README.txt

specialiosios Žeimių skelbimui.docx

sutarties projektas žeimiai (skelbimui).docx

Ready to get started?

Subscribe and enjoy all the benefits every day!