Preparation of a draft design for bus stops and other necessary infrastructure at the Kurna interchange on National Road No. 11 (Tallinn Ring Road approx. km 13.5 - 15.5), including a mobility study. AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Subject of the Procurement

  • Objective: Preparation of a draft design for bus stops and other necessary infrastructure at the Kurna interchange on National Road No. 11 (Tallinn Ring Road, km 13.5–15.5), including a mobility study.
  • Technical requirements:
    • Preparation of mobility analysis and bus stop alternatives (at least 3 variants).
    • Holistic resolution of the traffic environment (including bicycle and pedestrian path network, safety).
    • Compliance with the Estonian Transport Administration’s guide…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

311199_ESPD_v2.0_laiendatud.xml

311199_hankepass_taiendavate_selgitustega.pdf

311199_hindamiskriteeriumid.pdf

311199_vastavustingimused.pdf

311199.zip

HD II Hankelepingu projekt .docx

HD III Lisa 1 - Projekteeritava loigu asukohaskeem.docx

HD III Lisa 2 - Variantide vordlus.docx

HD III Lisa 3 - Nouded toovotjale.docx

HD III Tehniline kirjeldus.docx

HD III Tehniline kirjeldus koos lisadega.zip

HD II Lisa 5 Taitmistagatise garantii.docx

HD I Vorm 1 Volikiri ühispakkuja esindamiseks.docx

HD I Vorm 2a Teise isiku nõusolek (majanduslik).docx

HD I Vorm 2b Teise isiku nõusolek (tehniline).docx

HD I Vormid.zip

HD IV Too osade uleandmise ja maksegraafik.xlsx

Riigihanke alusdokument.docx

Ready to get started?

Subscribe and enjoy all the benefits every day!