Preparation of the Peedu Bridge reconstruction project AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Subject of the procurement

  • Procurement title: Preparation of the Peedu Bridge reconstruction project.
  • Objective: Reconstruction or replacement of the Peedu road bridge, ensuring proper load-bearing capacity, traffic safety, and a lifespan of at least 75 years.
  • Technical requirements:
    • The design must take into account the results of the bridge’s technical condition monitoring and the requirements of the Environmental Board.
    • A compromise between light traffic and transit traffic must be…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

310050_alltoovotjate_kontrollimise_tingimused.pdf

310050_ESPD_v2.0_laiendatud.xml

310050_hankepass_taiendavate_selgitustega.pdf

310050_hindamiskriteeriumid.pdf

310050_vastavustingimused.pdf

310050.zip

Hankejuhend - Peedu silla rekonstrueerimisprojekt (1).docx

Keskkonnaameti seisukoht Peedu silla rekonstrueerimise lähteülesandele.pdf

Lisa 1 Elva linna tänavate ehitusgeoloogilise uuringu nõuded.pdf

Lisa 2 Elva valla tänavate geodeesia tehniline kirjeldus.pdf

Peedu _sild_monitooring_2020_2025.asice

Tehnilised tingimused_Peedu sild.docx

Töövõtuleping Peedu silla rekonstrueerimisprojekti koostamine.docx

Vorm 1 - Hankemenetlusel osalemise avaldus.docx

Vorm 2 - Projektijuhi ja projekteerija kinnitused.docx

Ready to get started?

Subscribe and enjoy all the benefits every day!