Here is the most important information for the supplier, prepared based on the provided procurement documents: # Procurement Object * Object: Preparation of the technical design (TDP) for the electrode boiler and equipment installation works. * Key technical requirements: * Design and installation of a 10 MWel electrode boiler (EB) system. * Integration of the system into the existing thermal power plant (E-2). * Ability to participate in the electricity balancing market (mFRR, aFRR, FCR…
To see full summary, please log in or register.