Installation of scaffolding for the waste-to-energy boiler at the Iru Power Plant AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Tender object

  • What is being procured: Finding a contractor for the installation and dismantling of scaffolding for the waste-to-energy boiler (AK-3) and the waste incineration unit (JPP) at Enefit OÜ Iru Power Plant during the summer shutdowns of 2026, 2027, and 2028.
  • Main technical requirements, features:
    • Scaffolding must comply with European Scaffold Standard BS12811-1 and Tube and Fitting Scaffold Standard TG2013 requirements.
    • Certain scaffolding (e.g., S4) may require DESIGN Scaffolds
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

308107_hindamiskriteeriumid.pdf

308107_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

308107_vastavustingimused.pdf

308107.zip

Hanke alusdokumendid (RHAD)_308107.doc

Lisa 1/1 Tallinn_FurnaceScaffolding_Others_a.pdf

Lisa 1/1 WTE Tallinn_Scaffolding.pdf

Lisa 1/Isometric 169-0.pdf

Lisa 1/Isometric 170-0.pdf

Lisa 1/S4_Furnace_Scaffolding_ForInformation_a.pdf

Lisa 1 Tehniline kirjeldus_308107.docx

Lisa 2 lisa 2 Töövõtulepingu üldtingimused_EST.pdf

Lisa L1.zip

Lisa L3_KKO.xlsx

Lisa nr 2 Lepingu tingimused.docx

Vorm I Taotlus hankes osalemiseks-15847136.docx

Vorm I Taotlus hankes osalemiseks-9917833.docx

Ready to get started?

Subscribe and enjoy all the benefits every day!