Testing of solid oxide electrolyser stacks

TEDAS your procurement assistant

Ask a question about this procurement

t

Procurement Object

  • What is being procured: Testing of co-electrolysis (H₂O and CO₂) for hydrogen or syngas production using Solid Oxide Electrolyzers (SOE) prototype (approx. 10–12 kW capacity).
  • Main technical requirements, characteristics:
    • High-temperature, system-level testing under realistic operating conditions is required.
    • Work includes testing, documentation preparation, and results presentation (D3 report).
    • Equipment compatibility: The provider must confirm that their test rigs and furnaces can accommodate **SOE samples with maximum external…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

295765_hindamiskriteeriumid.pdf

295765_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

295765_vastavustingimused.pdf

295765.zip

Contract for Services (Hydrogen stack testing).docx

Contract General terms and conditions.pdf

Form Authorisation of joint tenderer.docx

Form Bid price breakdown.xlsx

Form List of contracts.docx

Form List of Subcontractors.docx

GUIDELINES FOR BIDDERS.docx

Scope of Works Appendix 1 SOEC_Stack_Test_Protocol_Enefit_H2Electro_v02.xlsx

Scope_of_Works_Electrolyser_Stack_Testing_v03.docx

Ready to get started?

Subscribe and enjoy all the benefits every day!