Turnkey design, procurement, and construction of Narva 100MW hydrogen-capable heat and power plant AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Procurement Object

  • What is being procured: Turnkey design, procurement, and construction (EPC) of a 100 MW hydrogen-capable combined heat and power (CHP) plant in Narva.
  • Main technical requirements:
    • Capacity: At least 100 MW (net) for combined heat and power generation.
    • Technology: Gas Reciprocating Internal Combustion Engines (RICE) (4–13 MW/engine).
    • Fuel: Natural gas/biomethane, at least 25% vol. hydrogen capability and readiness for 100% hydrogen by 2040.
    • Service: Provision of…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

10. Relevant Information for the Preparation of Preliminary Estimate for EIA parandatud.docx

10. Relevant Information for the Preparation of Preliminary Estimate for EIA parandatud.docx

11. Occupational health and safety requirements for the contractual partners of Eesti Energia.pdf

11. Occupational health and safety requirements for the contractual partners of Eesti Energia.pdf

1.1. Topogeodetical report.pdf

1.1. Topogeodetical report.pdf

12. Natural gas composition March 2025.pdf

12. Natural gas composition March 2025.pdf

1.2. Topogeodetical map.dwg

1.2. Topogeodetical map.dwg

13. P350 Requirements for electricity meters, ver.5.pdf

13. P350 Requirements for electricity meters, ver.5.pdf

14.1. Transformer inspection report 66-2025-VS-T(1Т)_1.docx

14.1. Transformer inspection report 66-2025-VS-T(1Т)_1.docx

14.2. Transformer inspection report 81-2025-VS-T(12Т).docx

14.2. Transformer inspection report 81-2025-VS-T(12Т).docx

14.3 Transformer inspection report 90-2025-VS-LV_1T.docx

14.3 Transformer inspection report 90-2025-VS-LV_1T.docx

14.4 Transformer inspection report 91-2025-VS-LV_12T.docx

14.4 Transformer inspection report 91-2025-VS-LV_12T.docx

2.1. Geotechnical investigation report.pdf

2.1. Geotechnical investigation report.pdf

2.2. Geological survey point location plan.dwg

2.2. Geological survey point location plan.dwg

294332_alltoovotjate_kontrollimise_tingimused.pdf

294332_hindamiskriteeriumid.pdf

294332_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

294332_vastavustingimused.pdf

294332.zip

3. Terminal points.dwg

3. Terminal points.dwg

4. Balti PP transportation limits.pdf

4. Balti PP transportation limits.pdf

5.1. Electrical concept single line diagram.pdf

5.1. Electrical concept single line diagram.pdf

5.2. Cable routes.pdf

5.2. Cable routes.pdf

6.1. National implementation of RfG established by Elering.docx

6.1. National implementation of RfG established by Elering.docx

6.2. Standard terms and conditions of connection to the electricity transmission system of Elering AS.pdf

6.2. Standard terms and conditions of connection to the electricity transmission system of Elering AS.pdf

6.3. Elering Balti 330kV substation output.txt

6.3. Elering Balti 330kV substation output.txt

7. Standard terms and conditions of connection to the natural gas grid.pdf

7. Standard terms and conditions of connection to the natural gas grid.pdf

8. Technical requirements for Narva district heating network.doc

8. Technical requirements for Narva district heating network.doc

9.1. Eesti Energia turva- ja tuleohutuse põhimõtted - Lisa 2.pdf

9.1. Eesti Energia turva- ja tuleohutuse põhimõtted - Lisa 2.pdf

9.2. Eesti Energia turva- ja tuleohutuse põhimõtted - Lisa 3.pdf

9.2. Eesti Energia turva- ja tuleohutuse põhimõtted - Lisa 3.pdf

9.3. Eesti Energia turva- ja tuleohutuse põhimõtted - Lisa 4.pdf

9.3. Eesti Energia turva- ja tuleohutuse põhimõtted - Lisa 4.pdf

9.4. Fire extinguishing water supply locations.pdf

9.4. Fire extinguishing water supply locations.pdf

Annex 1 - Owner's Requirements.zip

Annex 1 - Owner's Requirements.zip

Annex 2 - Owner's Information.zip

Annex 2 - Owner's Information.zip

Annex 3 - EPC Contract.docx

Annex 3 - EPC Contract.docx

Annex 4 - Schedules.zip

Annex 4 - Schedules.zip

Code of Ethics.pdf

Code of Ethics.pdf

Form 1a - Reference contracts.docx

Form 1b - Reference contracts.docx

Hanke alusdokumendid Rev3.zip

Instructions to Tenderers Rev2.pdf

Juhised pakkujatele_Rev 2.pdf

Occupational health and safety requirements.pdf

Occupational health and safety requirements.pdf

Procurement documents Rev3.zip

Schedule 10 - Payment Milestones.docx

Schedule 10 - Payment Milestones.docx

Schedule 11 - Insurance.docx

Schedule 11 - Insurance.docx

Schedule 12 - Securities.docx

Schedule 12 - Securities.docx

Schedule 13 - Contractor’s Suppliers .docx

Schedule 13 - Contractor’s Suppliers .docx

Schedule 14 - LTSA.docx

Schedule 14 - LTSA.docx

Schedule 15 - Forms of certificates.docx

Schedule 15 - Forms of certificates.docx

Schedule 1 - Performance Guarantees_Rev 1 (1).docx

Schedule 1 - Performance Guarantees_Rev 1 (1).docx

Schedule 3 - Owner’s Scope.docx

Schedule 3 - Owner’s Scope.docx

Schedule 4 - Contractor’s Technical Proposal.docx

Schedule 4 - Contractor’s Technical Proposal.docx

Schedule 5 - Spare Parts and tools.docx

Schedule 5 - Spare Parts and tools.docx

Schedule 6 - Contractor’s Documents to be Submitted during Executionv3.docx

Schedule 6 - Contractor’s Documents to be Submitted during Executionv3.docx

Schedule 7 - Project Schedule Milestones .docx

Schedule 7 - Project Schedule Milestones .docx

Schedule 8 - Time Schedule .docx

Schedule 8 - Time Schedule .docx

Schedule 9 - Contract price and price breakdown.docx

Schedule 9 - Contract price and price breakdown.docx

Section 01 - General Project Managament.pdf

Section 01 - General Project Managament.pdf

Section 02 – Scope, technical and operational requirements.pdf

Section 02 – Scope, technical and operational requirements.pdf

Section 03 – Engine generator and associated plant.pdf

Section 03 – Engine generator and associated plant.pdf

Section 04 – Balance of plant.pdf

Section 04 – Balance of plant.pdf

Section 05 – Civil and Structural.pdf

Section 05 – Civil and Structural.pdf

Section 06 b) – IT Non-Functional Requirements.pdf

Section 06 b) – IT Non-Functional Requirements.pdf

Section 06 – Control and instrumentation.pdf

Section 06 – Control and instrumentation.pdf

Section 06 c) – OT Non Functional Requirements.pdf

Section 06 c) – OT Non Functional Requirements.pdf

Section 07 – Electrical equipment.pdf

Section 07 – Electrical equipment.pdf

Section 08 – Maintenance and spare parts.pdf

Section 08 – Maintenance and spare parts.pdf

Section 09 – Training.pdf

Section 09 – Training.pdf

Section 10 – Quality Control and Assurance.pdf

Section 10 – Quality Control and Assurance.pdf

Section 11 – Testing and commissioning.pdf

Section 11 – Testing and commissioning.pdf

Section 12 – District heating and heat storage.pdf

Section 12 – District heating and heat storage.pdf

Section 14 - LTSA prop.pdf

Section 14 - LTSA prop.pdf

Section 6d - General Requirements for Designing_Building IT Networks and Cabling.pdf

Section 6d - General Requirements for Designing_Building IT Networks and Cabling.pdf