Design of the Monitoring Equipment System for the Ash Field Containment Dams of the Estonian Power Plant AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Procurement Object

  • Subject of Procurement: Design of the control and measurement equipment system for the earth dams of the Estonian Power Plant ash field. This includes the inspection of existing control and measurement equipment, defect identification, and the design of new equipment for the ash disposal site crest level of the Estonian Power Plant at an elevation of 75–80 m.
  • Main technical requirements, features:
    • The project’s goal is to ensure the…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

293602_hindamiskriteeriumid.pdf

293602_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

293602_Tehniline ülesanne_ET.docx

293602_Tehniline ülesanne_RU.docx

293602_Tehniline ülesanne.zip

293602_Töövõtulepingu vorm.docx

293602_tutvumisvisiidi info.docx

293602_vastavustingimused.pdf

293602.zip

Eesti Energia kontserni partnerite eetikakoodeks (21112022).pdf

Eesti Energia TTO nouded.pdf

Juhised pakkujatele_Lihthange_14092022.pdf

Toovotulepingu_uldtingimused_est.pdf

TÜ Lisa 1. Piesomeetrite ning märkide asukohtade plaan.dwg

TÜ Lisa 2. Võrdlusjooned.dwg

TÜ Lisa 3. Olemasolevate kontroll- ja mõõteseadmete loend.jpg

TÜ Lisa 4. Piesomeetrite tüüpjoonis.dwg

TÜ Lisa 5. Märkide tüüpjoonis.dwg

TÜ Lisa 6. Kontroll- ja mõõteseadmete osa projektist.docx

Vastutuse jagamise kokkulepe vorm_POWER OU.doc

Vorm 1 Pakkumuse vorm.xlsx

Vorm 2 Lepingute nimekiri.docx

Vorm 3 Vastutavate spetsialistide nimekiri.docx

Ready to get started?

Subscribe and enjoy all the benefits every day!