Design of the Water Supply Reconstruction for Sauga Primary School AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Object of Procurement

  • What is being procured: Design for the reconstruction of the water supply system at Sauga Primary School.
  • Main technical requirements, characteristics:
    • The scope of work includes the design of approx. 300 m of communal utility pipelines (ÜVK).
    • The project solution must be at the main project stage (according to standard EVS932:2017).
    • The diameter of the main pipeline shall be De110.
    • During the project, a **geodetic…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

2024.10.29 NΣuded IKσ joonistele.docx

293598_hindamiskriteeriumid.pdf

293598_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

293598_vastavustingimused.pdf

293598.zip

Lähteülessanne Sauga kooli veevarustus.pdf

Lisa 1 Näidis IKσ ala.dgn

Lisa 1 Tori valla projekteerimistingimused.asice

Lisa 2 Näidis IKσ asendiplaan.dgn

Lisa 2 Näidis IKσ asendiplaan.dwg

Lisa 3 Nõuded IKÕ joonistele.zip

Lisa 4 AQ23113_PP_v03_Moisapargi-VKV.asice

Projekteerimise töövõtuleping.docx

Vorm KI.doc

Vorm KII.doc

Vorm PI.doc

Vorm PII.doc

Ready to get started?

Subscribe and enjoy all the benefits every day!