Lääne-Viru County, Väike-Maarja Municipality, Pikevere feeder reconstruction (Phase I, IP6386) AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Object of Procurement

  • What is being procured: The object related to the procurement is the Reconstruction of the Pikevere feeder (Phase I, IP6386), which involves construction works (electrical installations, line reconstruction, and substation replacement/installation).
  • Main technical requirements, characteristics:
    • Replacement of Medium Voltage (MV) overhead lines with underground cable lines (D160 cable protection duct, open/closed method).
    • Replacement of MV overhead lines with insulated overhead lines (BLL-99 and BLL-62).
    • Replacement of…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

292067_hindamiskriteeriumid.pdf

292067_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

292067_vastavustingimused.pdf

292067.zip

EPP kasutusjuhend partneritele ver.4/EPP kasutajaks registreerimise vorm.xlsx

EPP kasutusjuhend partneritele ver.4/J3116 EPP kasutusjuhend partneritele ver.3(1).pdf

IP6386 Hanke lisatingimused.docx

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-3-01_seletuskiri.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-3-02_VKVR2407.xlsx

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-4-00_üldplaan.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-4-01_asendiplaan_v01.dwg

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-4-01_asendiplaan_v01.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-4-02_demontaaz.dwg

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-5-02_AJ14994.dwg

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-5-02_AJ14994.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-5-03_AJ14995.dwg

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-5-03_AJ14995.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-5-04_AJ14996.dwg

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-5-04_AJ14996.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-5-06_AJ14990_MPskeem.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-5-06_AJ14991_MPskeem.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-5-06_AJ14992_MPskeem.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-5-06_AJ14993_MPskeem.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-5-06_AJ14994_MPskeem.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-5-06_AJ14995_MPskeem.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-5-06_AJ14996_MPskeem.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-5-06_AJ15702_MPskeem.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-5-06_MPskeem.dwg

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-5-07_KPskeem.dwg

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-5-07_KPskeem.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-6-01_ristumine.dwg

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-6-01_ristumine.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-6-02_kaevis.dwg

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-6-02_kaevis.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-7-01_AJ14990.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-7-01_AJ14991.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-7-01_AJ14992.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-7-01_AJ14993.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-7-01_AJ15702.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-7-01_M41.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-7-01_M42.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-7-01_mastid.dwg

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-7-01_VaoPuhastusseadmete_sisestus.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-8-01_mastitabel.xlsx

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-8-03_demontaaž.docx

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-8-03_demontaaž.pdf

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-8-04_spets.docx

IP6386 tööprojekti muudatus 16.03.25/P23006_IP6386_TP_EL-8-04_spets.pdf

IP6386 tööprojekti muudatus 160325.zip

Lihthanke alusdokumendid 25.02.2025/Eesti Energia kontserni partnerite eetikakoodeks (21.11.2022).pdf

Lihthanke alusdokumendid 25.02.2025/EPP kasutusjuhend partneritele ver.4.zip

Lihthanke alusdokumendid 25.02.2025/Oluline info hankes osalejale LIHTHANGE (17.12.2024).docx

Lihthanke alusdokumendid 25.02.2025/P1120 Elektrilevi infosüsteemide kasutamise tingimused ver.3/Lisa1-Kasutaja esindajad ja infosüsteemid.docx

Lihthanke alusdokumendid 25.02.2025/P1120 Elektrilevi infosüsteemide kasutamise tingimused ver.3/Lisa-2_Nouded-arvutile-ja-kasutajale.docx

Lihthanke alusdokumendid 25.02.2025/P1120 Elektrilevi infosüsteemide kasutamise tingimused ver.3/P1120 Elektrilevi infosüsteemide kasutamise lepingu tingimused, ver.3.pdf

Lihthanke alusdokumendid 25.02.2025/Töötervishoiu ja tööohutuse nõuded Eesti Energia lepingupartneritele (2.11.2020).pdf

Lihthanke alusdokumendid 25.02.2025/V113 Töövõtulepingu vorm ver.12 (17.12.2024).zip

Lihthanke alusdokumendid 25.02.2025/Varasemate hankelepingute informatsioon.docx

Lihthanke alusdokumendid 25.02.2025/Volikiri ühispakkuja esindamise kohta.docx

Lihthanke alusdokumendid 25022025.zip

Maksumuse_tabel_IP6386_19032025.xls

P1111 Isikuandmete töötlemise tüüptingimused ver.3.pdf

P135 Elektripaigaldiste ehitustööde töövõtu tüüptingimused ver.23.pdf

P23006_IP6386_TP_EL-4-02_demontaaz_2510221201.pdf

Töö mahtude tabel_16032025.xls

V113 Töövõtulepingu vorm ver. 12 (17.12.2024).docx

V178 Töö mahtude tabeli muudatus_16_03_2025.xlsx

Ready to get started?

Subscribe and enjoy all the benefits every day!