Construction of the Fur Animal Pumping Station Overflow AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Procurement Object

  • What is being procured: Construction of the overflow pipeline for the fur animal pumping station.
  • Main technical requirements, characteristics:
    • Installation of approx. 15 m of gravity sewage pipeline (from the existing well to the discharge point VKV-5-01 with stone reinforcement).
    • Includes documenting the existing situation with photos before construction work.
    • The contractor is obliged to restore the previous situation if the wood stack has to be temporarily…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

1191_PP_KarusloomaVKV_2025-01-13.asice

291071_hindamiskriteeriumid.pdf

291071_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

291071_vastavustingimused.pdf

291071.zip

Ehitusloa andmine Nelgi tn 2 Tulbi tn 9, Audru alevik.asice

Karuslooma pumpla ülevoolutorustiku ehitusleping.docx

Lähteülesanne_Karuslooma pumpla ülevool.pdf

Vorm KI.doc

Vorm KII.doc

Vorm PI.doc

Ready to get started?

Subscribe and enjoy all the benefits every day!