Construction of the ventilation system for the B-building of Tallinn Industrial Education Centre AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Object of Procurement

  • What is being procured: Construction of the ventilation system for the B-building of Tallinn Industrial Education Centre.
  • Main technical requirements, features:
    • The existing ventilation system does not ensure the required air exchange.
    • Construction works include the dismantling of the existing ventilation system, the establishment of a new central heat recovery forced ventilation system, installation and insulation of ventilation ductwork, installation of units and equipment (including SV2, SV6,…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

290555_alltoovotjate_kontrollimise_tingimused.pdf

290555_ESPD_v2.0_laiendatud.xml

290555_hankepass_taiendavate_selgitustega.pdf

290555_hindamiskriteeriumid.pdf

290555_vastavustingimused.pdf

290555.zip

B-korpuse torustiku plaanid.docx

Lisa 1 Tehniline kirjeldus 25022025.docx

Lisa 2 - Hankelepingu projekt.docx

Pakkumuse esitamise ettepanek.docx

Vorm 2.docx

Vorm 3.xlsx

Vorm 4.docx

Vorm 8.docx

Ready to get started?

Subscribe and enjoy all the benefits every day!