Reconstruction of the 0.69kV switchgear at Wastewater Treatment Plant Substation 36.09 AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Object of Procurement

  • What is being procured: Reconstruction of the 0.69kV switchgear at Wastewater Treatment Plant Substation 36.09.
  • Main technical requirements, characteristics:
    • Replacement of the existing 0.69 kV distribution switchgear with an equivalent complete distribution switchgear.
    • Connection of new 0.69 kV switching devices and metering systems to the SCADA system to enable remote monitoring.
    • Design will be carried out at the work design stage (Annex 2, point 1.14.1.5).
      *…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

289641_alltoovotjate_kontrollimise_tingimused.pdf

289641_hindamiskriteeriumid.pdf

289641_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

289641_vastavustingimused.pdf

289641.zip

Lihthankemenetluse kord.docx

Lisa 1 Ehitus- ja paigaldustööde üldtingimused 1012025.pdf

Lisa 1 Joonised.zip

Lisa 2 - Tehniline kirjeldus.docx

Lisa 3 - Pakkumuse maksumuse vorm-14220834.xlsx

Lisa 3 - Pakkumuse maksumuse vorm-14220835.xlsx

Lisa 4 Töötervishoiu-, -ohutuse- ja keskkonnanõuded AS Tallinna Vesi.pdf

Lisa 5 - Nõuded hangitavatele jaotla lülitussüsteemidelel.xlsx

pan690 2024-Layout1.pdf

PVPAJ11 2024-Layout1.pdf

PVPAJ21 2024-Layout1.pdf

PVPAJ31 2024-Layout1.pdf

PVPMP 2024-Layout1.pdf

Töövõtuleping.docx

Ready to get started?

Subscribe and enjoy all the benefits every day!