Reconstruction of the Männikjärve Bog Educational Trail AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Object of Procurement

  • What is being procured: Reconstruction works for the Männikjärve Bog educational trail (Phase II).
  • Main technical requirements, characteristics:
    • Reconstruction includes the construction of a wood chip path (approx. 911 running meters, 1.6 m wide, with geocell mesh) and the reconstruction of 7 existing bridges (4 pcs 5 m long and 3 pcs 7 m long).
    • 7 dilapidated bridges together with support posts will be demolished.
    • Selection…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

24127KP2 Männikjärve õpperaja rek - kululoend (II etapp).xlsx

24127KP2_PP_MA-3-01_Seletuskiri.pdf

24127KP2_PP_MA-4-01_Asendiplaan.pdf

24127KP2_PP_MA-6-01_Sild5m.pdf

24127KP2_PP_MA-6-02_Sild7m.pdf

24127KP2_PP_MA-6-03_Rajakonstruktsioon.pdf

24127KP2_PP_MA-9-01_Ehitusaegnejuurdepaasjalaoplatsid.pdf

289277_ESPD_v2.0_laiendatud.xml

289277_hankepass_taiendavate_selgitustega.pdf

289277_hindamiskriteeriumid.pdf

289277_vastavustingimused.pdf

289277.zip

Hankelepingu projekt.docx

HD.docx

KVV_1.0._Männikjarve_raba_opperada_rajaosa_kontr_08.01.2025_AVALIK.pdf

KVV_1_asendiplaan_Mannikjarve_raba_opperada_rajaosa_A4.pdf

LISA 1 Tehniline kirjeldus.docx

Lisa 1 – tööprojekt „Männikjärve raba õpperaja rekonstrueerimisprojekti II etapp“ (Töö nr 24127KP2).zip

Lisa 2 - Külastusobjekti kaitseväärtuste väljavõte.zip

Ühispakkujate volikiri ja kinnitus.doc

Ready to get started?

Subscribe and enjoy all the benefits every day!