Design for increasing the reliability of the fire extinguishing system at Auvere power plant AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Object of the procurement

  • What is being procured: Design (Work Project) for increasing the reliability of the fire extinguishing system at Auvere power plant.
  • Main technical requirements, features: The purpose of the procurement is to design (Work Project) the increase in reliability of the existing fire extinguishing system. More detailed scopes and conditions are provided in the procurement base documents.
  • Geographical scope or location of service provision: Place of execution is…
     
    To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

303589_hindamiskriteeriumid.pdf

303589_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

303589_Tehniline ülesanne_ET.docx

303589_Tehniline ülesanne koos lisadega.zip

303589_Tehniline ülesanne_RU.docx

303589_Töövõtulepingu vorm.docx

303589_tutvumisvisiidi info.docx

303589_vastavustingimused.pdf

303589.zip

Annex 2_Architectural-Structural DRW/NAR99MUQA--E022ACE002_I_ASB.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E022ACE003_H_ASB.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E022ACE004_H_ASB.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E022ACE005_G_ASB.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E022ACE006_F_ASB.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E022ACE007_D_ASB.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E022ACE008_F_ASB_Pump Basement.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E022ACE009_D_ASB.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E022ACE010_D_ASB.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E022ACE011_E_ASB.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E022ACE012_D_ASB.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E022ACE013_A_FUS.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E022ACE013_C_ASB_ELT Network.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E022ACE014_D_ASB.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E022ACE015_D_ASB.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E022ARA002_D_ASB.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E022ARA005_C_ASB.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E022ARA008_C_ASB.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E022ARA013_C_ASB.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E022ARA015_C_ASB.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E023MCE016_D_ASB.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E028ACF001_E_ASB.pdf

Annex 2_Architectural-Structural DRW/NAR99MUQA--E028ACF003_E_ASB.pdf

Annex 2_Architectural-Structural DRW/NAR_99_M_UQA-----E02_GA001-G-1.pdf

Annex 2_Architectural-Structural DRW/NAR_99_M_UQA-----E02_GA001-G-2.pdf

Annex 3_NAR99M-------E01OI001_Operating Instructions/NAR99M-------E01OI001_EN_Operating Instructions.pdf

Annex 3_NAR99M-------E01OI001_Operating Instructions/NAR99M-------E01OI001_EST_Operating Instructions.pdf

Annex 4_Jockey Pump_Motor_Controller_Instructions/Jockey Pump Control Panel Instruction_EST.pdf

Annex 4_Jockey Pump_Motor_Controller_Instructions/Jockey Pump Control Panel Instruction.pdf

Annex 4_Jockey Pump_Motor_Controller_Instructions/JOCKEY PUMP drawing_EST.pdf

Annex 4_Jockey Pump_Motor_Controller_Instructions/JOCKEY PUMP drawing.pdf

Annex 4_Jockey Pump_Motor_Controller_Instructions/NAR99MUQA----E01WD003_JOCKEY PUMP WiringDiagram.pdf

Annex 6_FF System Detecton General Wiring Diagram/NAR10M------E01LM001_FF System Signal Exchange List.pdf

Annex 6_FF System Detecton General Wiring Diagram/NAR10M------E01WD001-1_FF-GenWiringDiagram.pdf

Annex 6_FF System Detecton General Wiring Diagram/NAR10M------E01WD001-4_FF-GenWiringDiagram.pdf

Annex 6_FF System Detecton General Wiring Diagram/NAR10M------E01WD003_FF-ComNetworkWiringDiagram.pdf

Eesti Energia kontserni partnerite eetikakoodeks (21112022).pdf

Eesti Energia TTO nouded.pdf

Juhised pakkujatele_Lihthange_14092022.pdf

koostoopartnerite-isikuandmete-tootlemise-pohimotted-ET.pdf

Tööandjate vastutuse ja kohustuste jaotus töötervishoiu ja tööohutuse tagamisel.pdf

Toovotulepingu uldtingimused_EST_09062025.pdf

TÜ Lisa 1. NAR_99_M_SGA----FD_001_FF PUMPS_DIAGRAM.pdf

TÜ Lisa 2. Architectural-Structural DRW.zip

TÜ Lisa 3. Dokument NAR99M-E01OI001_Operating Instructions .zip

TÜ Lisa 4. Jockey Pump_Motor_Controller_Instructions.zip

TÜ Lisa 5. NAR_99_M_UQA----E01_EA_001-FF Pipe Line E02.pdf

TÜ Lisa 6. FF System Detecton General Wiring Diagram.zip

TÜ Lisa 7. Gen Plan_Cable Line Installation.pdf

Vorm 1 Pakkumuse vorm.xlsx

Vorm 2 Lepingute nimekiri.docx

Vorm 3 Vastutavate spetsialistide nimekiri.docx