Construction of Kostivere Study Trail Infrastructure AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Procurement Object

  • What is being procured: Construction of the Kostivere study trail infrastructure.
  • Main technical requirements, characteristics:
    • The scope of the contract results from the basic design prepared by Selektor Projekt OÜ titled
      “Kostivere study trail infrastructure design works” (Work No: PH2405).
    • Quality: The parties start from the General Quality Requirements for Construction Works (RYL), the quality class must be II or higher.
    • Construction Works Manager: Must possess at…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

300539_alltoovotjate_kontrollimise_tingimused.pdf

300539_ESPD_v2.0_laiendatud.xml

300539_hankepass_taiendavate_selgitustega.pdf

300539_hindamiskriteeriumid.pdf

300539_vastavustingimused.pdf

300539.zip

Hankedokument RH 300539.docx

KVV_2.2._Kostivere_karstiala_25.09.2025_AVALIK.pdf

KVV_asendiplaan_Kostivere_karstiala_A4.pdf

LISA 1 Tehniline kirjeldus.docx

Lisa 2 TÖÖVÕTULEPING nr.docx

Lisa 3 PH2405_PP_Kostivere-opperaja-taristu-orig.asice

Lisa 3 PH2405_PP_Kostivere-opperaja-taristu-pdf.asice

Lisa 4 hinnapakkumuse vorm.xlsx

Lisa 5 KVV_22_Kostivere_karstiala_25092025_AVALIK.zip

Ready to get started?

Subscribe and enjoy all the benefits every day!