L8011 and L163 Cable Line Construction AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Object of the procurement

  • What is being procured: Construction of cable lines L8011 and L163 (Construction works).
  • Main technical requirements, characteristics:
    • These are 110 kV XLPE insulated single-core power cables (underground and subsea).
    • A copper conductor earth return cable and a 96-fiber communication cable (optical) will also be installed.
    • The construction methods used are open trench and trenchless (horizontal directional drilling).
    • The cable installation depth is a minimum…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

1_Lähtematerjalid/0_Hankedokumendid/Hanke maht ja kirjeldus.doc

1_Lähtematerjalid/0_Hankedokumendid/Lisa 1 - Mahu plaan.png

1_Lähtematerjalid/0_Hankedokumendid/Lisa 2 - T2 TT Veerenni - L163.doc

1_Lähtematerjalid/0_Hankedokumendid/Lisa 3 - Veerenni AJ asendiplaan - kaabel.pdf

1_Lähtematerjalid/1_Geodeesia/TT-6492-2 Veerenni AJ kaablid aruanne.asice

1_Lähtematerjalid/1_Geodeesia/TT-6492 Veerenni AJ kaablid.asice

1_Lähtematerjalid/2_Geoloogia/GE-3538 aruanne.asice

1_Lähtematerjalid/3_Dendroloogia/Veerenni AJ kaabelliinide trassi inventuuriaruanne (1).asice

1_Lähtematerjalid/3_Dendroloogia/Veerenni AJ kaabelliinide trassi inventuuriaruanne (2).asice

1_Lähtematerjalid/3_Dendroloogia/Veerenni AJ kaabelliinide trassi inventuuriaruanne.asice

1_Lähtematerjalid/4_Tehnilised tingimused/EVR TT.asice

1_Lähtematerjalid/4_Tehnilised tingimused/Gaasivõrk TT.asice

1_Lähtematerjalid/4_Tehnilised tingimused/Telia TT.bdoc

1_Lähtematerjalid/4_Tehnilised tingimused/TT_02-10-2023_Hepta-Elering-Veerenni (1).asice

1_Lähtematerjalid/5_Projekteerimistingimused/_PT 2311802-01020 Veerenni tn 110 kV el.kaabel.asice

299271_alltoovotjate_kontrollimise_tingimused.pdf

299271_hindamiskriteeriumid.pdf

299271_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

299271_vastavustingimused.pdf

299271.zip

2_Muudatusprojekt (v2)/1_Dokumendid/22595_EP_EL-3-01_Seletuskiri_v2.docx

2_Muudatusprojekt (v2)/1_Dokumendid/22595_EP_EL-3-01_Seletuskiri_v2.pdf

2_Muudatusprojekt (v2)/1_Dokumendid/22595_EP_EL-8-01_Spetsifikatsioonid_v2.pdf

2_Muudatusprojekt (v2)/1_Dokumendid/22595_EP_EL-8-01_Spetsifikatsioonid_v2.xlsx

2_Muudatusprojekt (v2)/1_Dokumendid/22595_EP_EL-8-02_Mahud_v2.pdf

2_Muudatusprojekt (v2)/1_Dokumendid/22595_EP_EL-8-02_Mahud_v2.xlsx

2_Muudatusprojekt (v2)/2_Joonised/22595_EP_EL-4-01_Asendiplaan_v2.dwg

2_Muudatusprojekt (v2)/2_Joonised/22595_EP_EL-4-01_Asendiplaan_v2.pdf

2_Muudatusprojekt (v2)/2_Joonised/22595_EP_EL-5-01_Kaabliskeem_v2.dwg

2_Muudatusprojekt (v2)/2_Joonised/22595_EP_EL-5-01_Kaabliskeem_v2.pdf

2_Muudatusprojekt (v2)/2_Joonised/22595_EP_EL-5-01_Kaablitrassi_pikiprofiil_v2.pdf

2_Muudatusprojekt (v2)/2_Joonised/22595_EP_EL-5-01_Kaablitrassi_pikiprofiil_v2-vormistuslik.dwg

2_Muudatusprojekt (v2)/3_Kooskõlastused/22595_EP_AA-2-01_KK-koondtabel.pdf

2_Muudatusprojekt (v2)/3_Kooskõlastused/22595_EP_AA-2-02_KK-Enefit-Valgustus.asice

2_Muudatusprojekt (v2)/3_Kooskõlastused/22595_EP_AA-2-03_KK-Edelaraudtee.asice

2_Muudatusprojekt (v2)/3_Kooskõlastused/22595_EP_AA-2-04_KK-Elektrilevi.asice

2_Muudatusprojekt (v2)/3_Kooskõlastused/22595_EP_AA-2-05_KK-Eesti-Raudtee.asice

2_Muudatusprojekt (v2)/3_Kooskõlastused/22595_EP_AA-2-06_KK-Gaasivõrgud.asice

2_Muudatusprojekt (v2)/3_Kooskõlastused/22595_EP_AA-2-07_KK-Tallinna-Vesi.asice

2_Muudatusprojekt (v2)/3_Kooskõlastused/22595_EP_AA-2-08_KK-Tarbegaas.pdf

2_Muudatusprojekt (v2)/3_Kooskõlastused/22595_EP_AA-2-09_KK-Telia.asice

2_Muudatusprojekt (v2)/3_Kooskõlastused/22595_EP_AA-2-10_KK-Siduri-3.pdf

2_Muudatusprojekt (v2)/4_Geotehnika/Veerenni tn rajatava Eleringi 110kV kaablitrassi projekt_HeptaGroupEnergy_2008.asice

2_Muudatusprojekt (v2)/5_Ehitusluba/Ehitusluba_2412271_08771.asice

elering-infotahvel copy.pdf

elering-infotahvel_Folder/elering-infotahvel.ai

elering-infotahvel_Folder/elering-infotahvel Report.txt

elering-infotahvel_Folder/Fonts/Arial Bold.ttf

elering-infotahvel_Folder/Fonts/Klavika-Bold.otf

elering-infotahvel_Folder/Fonts/Klavika-Medium.otf

elering-infotahvel_Folder/Fonts/Klavika-Regular.otf

elering-infotahvel_Folder/Fonts/MyriadPro-Regular.otf

Finantseerimise graafik.xlsx

Garantii lepinguliste kohustuste täitmise tagamiseks.docx

Garantiiperioodi tagatis.docx

Hankelepingu kavand.docx

Hanke maht 28.11.2025/011 Üldosa hanke maht.docx

Hanke maht 28.11.2025/031A Kõrgepingeseadmete spetsifikatsioon Veerenni_2025-07-18_kaabel.docx

Hanke maht 28.11.2025/031 Kõrgepingeseadmete hanke maht_Veerenni_2025-07-18_kaabel.doc

Hanke maht 28.11.2025/075 Scope of 110 kV cables_Veerenni_2025-09-05_L163A.doc

Hanke maht 28.11.2025/075 Scope of 110 kV cables_Veerenni_2025-09-05_L163B.doc

Hanke maht 28.11.2025/22595_EP_EL-4-01_Asendiplaan_LN_2025-10-07.dwg

Hanke maht 28.11.2025/Lisa 2 - T2 TT Veerenni - L163.doc

Hanke maht 28.11.2025/Trassivaliku projekt 28.02.2025.zip

Hanke maht 28.11.2025/Veerenni AJ - AJ skeem 2025-11-21.dwg

Hanke maht 28112025.zip

Hinnatabel_05-12-2025.xlsx

Isikuandmete töötlemise juhis_Lisa (standardvorm.docx

Juhised pakkujatele.docx

Kinnitus ja andmed alltöövõtjate kohta.doc

Küsimustikud.doc

__MACOSX/._elering-infotahvel copy.pdf

__MACOSX/elering-infotahvel_Folder/._elering-infotahvel.ai

__MACOSX/elering-infotahvel_Folder/._elering-infotahvel Report.txt

__MACOSX/elering-infotahvel_Folder/Fonts/._Klavika-Bold.otf

__MACOSX/elering-infotahvel_Folder/Fonts/._Klavika-Medium.otf

__MACOSX/elering-infotahvel_Folder/Fonts/._Klavika-Regular.otf

__MACOSX/elering-infotahvel_Folder/Fonts/._MyriadPro-Regular.otf

Pakkuja esindaja volikiri.doc

Pakkuja kinnitused.docx

Pakkumuse esildis.docx

Pakkumuse tagatis.docx

Teatis tööde lõpetamisest.docx

Tehnilised nõuded 26.22.2025/100 Üldnõuded/~$0 Dokumentatsioon_11.10.2024.docx

Tehnilised nõuded 26.22.2025/100 Üldnõuded/~$0 Dokumentatsioon_17.03.2025.docx

Tehnilised nõuded 26.22.2025/100 Üldnõuded/~$0 Dokumentatsioon.doc

Tehnilised nõuded 26.22.2025/100 Üldnõuded/~$0 Dokumentatsioon.docx

Tehnilised nõuded 26.22.2025/100 Üldnõuded/~$0 Dokumentatsioon juuli 2024.docx

Tehnilised nõuded 26.22.2025/100 Üldnõuded/~$0 Dokumentatsioon oktoober 2020.doc

Tehnilised nõuded 26.22.2025/100 Üldnõuded/~$0 Kvaliteedi tagamine_2021-04-14.doc

Tehnilised nõuded 26.22.2025/100 Üldnõuded/~$0 Kvaliteedi tagamine.doc

Tehnilised nõuded 26.22.2025/100 Üldnõuded/~$0 Nimiandmed nimesildid tähistused_detsember_2022.docx

Tehnilised nõuded 26.22.2025/100 Üldnõuded/~$0 Nimiandmed nimesildid tähistused.doc

Tehnilised nõuded 26.22.2025/100 Üldnõuded/~$0 Nimiandmed nimesildid tähistused_märts_2022.docx

Tehnilised nõuded 26.22.2025/100 Üldnõuded/~$0 Nimiandmed, nimesildid, tähistused oktoober 2020.doc

Tehnilised nõuded 26.22.2025/100 Üldnõuded/~$1 Üldosa hanke maht_2024-02-19.doc

Tehnilised nõuded 26.22.2025/100 Üldnõuded/~$5 Tööde korraldamine.doc

Tehnilised nõuded 26.22.2025/100 Üldnõuded/101 Üldnõuded.doc

Tehnilised nõuded 26.22.2025/100 Üldnõuded/115 Väliskeskkond.doc

Tehnilised nõuded 26.22.2025/100 Üldnõuded/120 Õigusaktid ja tehnilised normdokumendid.doc

Tehnilised nõuded 26.22.2025/100 Üldnõuded/125 Elektrilised parameetrid_2024-09-19.doc

Tehnilised nõuded 26.22.2025/100 Üldnõuded/130_A Skeemi tingmärgid.pdf

Tehnilised nõuded 26.22.2025/100 Üldnõuded/130 B Alajaama silt.pdf

Tehnilised nõuded 26.22.2025/100 Üldnõuded/130 C Ehitusinfo tahvel.zip

Tehnilised nõuded 26.22.2025/100 Üldnõuded/130 Nimiandmed nimesildid tähistused.docx

Tehnilised nõuded 26.22.2025/100 Üldnõuded/140 Dokumentatsioon.docx

Tehnilised nõuded 26.22.2025/100 Üldnõuded/145 Tööde korraldamine_11.02.2025.docx

Tehnilised nõuded 26.22.2025/100 Üldnõuded/150 Kvaliteedi tagamine_28.11.2024.doc

Tehnilised nõuded 26.22.2025/100 Üldnõuded/Alajaama käidu juhendi vorm_hd.docx

Tehnilised nõuded 26.22.2025/100 Üldnõuded/Thumbs.db

Tehnilised nõuded 26.22.2025/200 Ehitustööd/~$0 Hooned_2020-03-10.doc

Tehnilised nõuded 26.22.2025/200 Ehitustööd/~$0 Hooned_2021-02-26.docx

Tehnilised nõuded 26.22.2025/200 Ehitustööd/~$0 Hooned.doc

Tehnilised nõuded 26.22.2025/200 Ehitustööd/~$0 Territoorium_2019-02-20.doc

Tehnilised nõuded 26.22.2025/200 Ehitustööd/~$5 Väliselektripaigaldised oktoober 2020.doc

Tehnilised nõuded 26.22.2025/200 Ehitustööd/201 Ehitustööd.doc

Tehnilised nõuded 26.22.2025/200 Ehitustööd/210 Territoorium_16_09_2022.docx

Tehnilised nõuded 26.22.2025/200 Ehitustööd/211 Vundamendid ja kaablikaitsetarindid_02_01_2023.docx

Tehnilised nõuded 26.22.2025/200 Ehitustööd/Thumbs.db

Tehnilised nõuded 26.22.2025/700 Ülekandeliinid/~$0_110kV_Cable_Specification_2019-05-30.doc

Tehnilised nõuded 26.22.2025/700 Ülekandeliinid/700 logi.docx

Tehnilised nõuded 26.22.2025/700 Ülekandeliinid/700 Tehnilised juhised.pdf

Tehnilised nõuded 26.22.2025/700 Ülekandeliinid/701 Projekteerimine.pdf

Tehnilised nõuded 26.22.2025/700 Ülekandeliinid/702 Ehitamine.pdf

Tehnilised nõuded 26.22.2025/700 Ülekandeliinid/703 Materjalid.pdf

Tehnilised nõuded 26.22.2025/700 Ülekandeliinid/750_110kV_Cable_Specification_2025-11-26.doc

Tehnilised nõuded 26.22.2025/700 Ülekandeliinid/750A 110 kV cable questionnaire (muudetud 9.12.2020).doc

Tehnilised nõuded 26.22.2025/700 Ülekandeliinid/750R_110kV_Cable_Specification_2024-09-03.doc

Tehnilised nõuded 26.22.2025/700 Ülekandeliinid/751 Kaablitrassi tähistamine tulpade ja markerpallidega_2015-08-17.doc

Tehnilised nõuded 26.22.2025/700 Ülekandeliinid/Lisa 700A Õhuliinide tähistamine.pdf

Tehnilised nõuded 26.22.2025/700 Ülekandeliinid/Lisa 700B Projekti osad.xlsx

Tehnilised nõuded 26.22.2025/700 Ülekandeliinid/Lisa 700C Liiniahela pass.xlsx

Tehnilised nõuded 26.22.2025/700 Ülekandeliinid/Thumbs.db

Tehnilised nõuded 26222025.zip

Tööde eest vastutav(ad) isik(ud).doc

Tootjatehase volitus (eesti keeles).doc

Tootjatehase volitus (inglise keeles).doc

Ühispakkujate volikiri ja kinnitus.docx

Ready to get started?

Subscribe and enjoy all the benefits every day!