Construction of the Olustvere Müüri Street Footpath Section AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Object of Procurement

  • What is being procured: Construction of the Olustvere Müüri Street footpath section and installation of related outdoor lighting.
  • Main technical requirements, characteristics:
    • Footpath length is 110 m, width 2.5 m, cross slope 2.0%.
    • Pavement structures are defined for both the roadway (asphalt concrete AC16 surf, AC20 base) and the footpath (asphalt concrete AC8 surf).
    • Footpath curb stones are concrete (150x290 mm), installed on a concrete layer…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

00802_25_PP_EL_ Myyri_KLT/00802_25_PP_EL_3-01_seletuskiri.doc

00802_25_PP_EL_ Myyri_KLT/00802_25_PP_EL-8-01_mahud.xls

00802_25_PP_EL_ Myyri_KLT/00802_25_PP_esileht.doc

00802_25_PP_EL_ Myyri_KLT/EL_1.dwg

00802_25_PP_EL_ Myyri_KLT/EL_1.pdf

00802_25_PP_EL_ Myyri_KLT/EL_2_EL_3.dwg

00802_25_PP_EL_ Myyri_KLT/EL_2.pdf

00802_25_PP_EL_ Myyri_KLT/EL_3.pdf

00802_25_PP_EL_ Myyri_KLT/Lisa_1_Olustvere Müüri tn KLT.pdf

1_Asendiplaan_Olustvere_BIND.dwg

298606_ESPD_v2.0_laiendatud.xml

298606_hankepass_taiendavate_selgitustega.pdf

298606_hindamiskriteeriumid.pdf

298606_vastavustingimused.pdf

298606.zip

2_Pikiprofiilid_MüüriKLT.dwg

3_Tüüplõiked_MüüriKLT.dwg

Hankelepingu_projekt_Müüri_KLT_ehitus.rtf

Lihthankemenetluse kord - Olustvere Müüri KLT lõigu ehitamine.docx

Lisa 1 58-24-TP_Müüri_KLT_kululoend täiend liiklus ja künnis.xlsx

Lisa 2 00802_25_PP_EL-8-01_mahud.xls

Lisa 3 58-24-TP/58-24-TP_Müüri_KLT_kululoend.xlsx

Lisa 3 58-24-TP/5824TP_PP_TL-0-01_dok-nimekiri.xlsx

Lisa 3 58-24-TP/5824TP_PP_TL-3-01_v01_seletuskiri.pdf

Lisa 3 58-24-TP/5824TP_PP_TL-4-01_v01_asendiplaan.pdf

Lisa 3 58-24-TP/5824TP_PP_TL-5-01_v01_pikiprofiilid.pdf

Lisa 3 58-24-TP/5824TP_PP_TL-6-01_v01_tyyprl.pdf

Lisa 3 58-24-TP/5824TP_PP_TL-9-01_v01_kululoend.pdf

Lisa 3 58-24-TP.zip

Lisa 4 00802_25_PP_EL_ Myyri_KLT.zip

Müüri_tn_DWG.zip

Ready to get started?

Subscribe and enjoy all the benefits every day!