Blade bearing bolt replacement works for wind turbines in Pakri wind farm AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Procurement Object

  • What is being procured: Exchange work for turbine hub to blade interface bolts at Pakri wind farm (Pakri wind park hub to blade interface bolts exchange).
  • Main technical requirements, characteristics:
    • The service includes bolt replacement on all 8 Nordex N90 wind turbines (24 blade bearings in total).
    • Both outer and inner bolts must be replaced (except for WT3 and WT7, where inner bolts are not required or have…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

298248_hindamiskriteeriumid.pdf

298248_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

298248_vastavustingimused.pdf

298248.zip

Draft contract/Code of Ethics for EG partners.pdf

Draft contract/Draft contract.docx

Draft contract/General terms and conditions of contracts for services.pdf

Draft contract/Occupational health and safety requirements for the contractual partners of Eesti Energia.pdf

Draft contract.zip

Technical description/Appendix 1. Hub to blade interface bolts exchange instruction.xlsx

Technical description/Appendix 2. Pakri wind park site plan.pdf

Technical description/Technical description.docx

Technical description.zip

Tender price.xlsx

Ready to get started?

Subscribe and enjoy all the benefits every day!