Improvement of the continuity of the power supply for Tapa barracks AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Procurement object

  • What is being procured: Improvement of the power supply continuity for the Tapa military base.
  • Main technical requirements, features: Design and construction works for establishing a guaranteed supply to existing buildings.
    • Similar works are considered design and construction works of electrical infrastructure on at least two sites for the design and construction of internal and external electrical networks for systems with a fuse of at least 800A, including:
      *…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

297670_alltoovotjate_kontrollimise_tingimused.pdf

297670_hindamiskriteeriumid.pdf

297670_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

297670_vastavustingimused.pdf

297670.zip

RHAD Lisa 1 Vorm II Vastutavad isikud.rtf

RHAD Lisa 1 Vorm I Samalaadsete toode teostamine.rtf

RHAD Lisa 21 Julgeolekutingimused koos lisadega.docx

RHAD Lisa 2 Hankelepingu projekt.docx

RHAD Lisa 4 Tehnilise dokumentatsiooniga tutvumine.rtf

RHAD Lisa 5 Konfidentsiaalsustingimused.docx

RHAD Lisa 6 Maksumuse esildis.xlsx

RHAD.rtf

Ready to get started?

Subscribe and enjoy all the benefits every day!