Establishment and Arrangement of the Public Swimming Area at Aidu Water Sports Center AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Subject of Procurement

  • What is being procured: Establishment and arrangement of the public swimming area at Aidu Water Sports Center.
  • Main technical requirements, features:
    • Arrangement of the beach area as a public swimming spot.
    • Main works: Installation of a composting toilet and a waste container (0.77 m3), installation of a 10-space bicycle rack, **construction of a boardwalk (1.8 m wide, load-bearing structure made of 50x150 mm beams), installation of a…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

24004_PP_TL_V02_Aidu-juurdepaasutee-ja-rannaala.asice

297533_hindamiskriteeriumid.pdf

297533_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

297533_vastavustingimused.pdf

297533.zip

Ehitamise töövõtuleping (osa 2)projekt 2025-07-17 v2.doc

Ostumenetluse kord vnr 297533.docx

Täpsustatud hinnapakkumuse vorm.xlsx

Tehniline kirjeldus v2.docx

Ready to get started?

Subscribe and enjoy all the benefits every day!