Blade bearing bolt replacement works for wind turbines in Pakri wind farm AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Procurement Object

  • What is being procured: Exchange works for the hub-to-blade interface bolts at Pakri wind farm (Pakri wind park hub to blade interface bolts exchange).
  • Main technical requirements, characteristics:
    • The service covers the bolt exchange in all 8 Nordex N90 turbines (a total of 24 blade bearings).
    • All bolts and other parts necessary for fastening the blade bearing to the hub and the blade to the blade bearing must…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

297204_hindamiskriteeriumid.pdf

297204_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

297204_vastavustingimused.pdf

297204.zip

Draft contract/Code of Ethics for EG partners.pdf

Draft contract/Draft contract.docx

Draft contract/General terms and conditions of contracts for services.pdf

Draft contract/Occupational health and safety requirements for the contractual partners of Eesti Energia.pdf

Draft contract.zip

Technical description/Appendix 1. Hub to blade interface bolts exchange instruction.xlsx

Technical description/Appendix 2. Pakri wind park site plan.pdf

Technical description/Technical description.docx

Technical description.zip

Tender price.xlsx

Ready to get started?

Subscribe and enjoy all the benefits every day!