Construction of a section of the Alu district heating pipeline AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Subject of the Procurement

  • What is being procured: Construction of a section of the district heating pipeline (approx. 1.122 km).
  • Main technical requirements, features:
    • The designed pipeline is made of pre-insulated (insulation class II) steel pipes (P235GH– St 37), insulated with PUR foam.
    • Maximum design temperature parameters: T1/T2=75/50 °C.
    • Welded joints must comply with ISO 5817 level C.
    • Pipeline pressure test at 16 bar.
    • **Leakage Alarm System…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

1153_TP_SVV_Alu (4)/1153_TP_SVV-8-01_mat-loetelu.xlsx

1153_TP_SVV_Alu (4)/1153_TP_SVV-9-02_LAS.xlsx

1153_TP_SVV_Alu (4)/1153_TP_SVV_Alu.pdf

1153_TP_SVV_Alu (4)/1153_TP_SVV_bind.dwg

1153_TP_SVV_Alu.zip

297129_hindamiskriteeriumid.pdf

297129_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

297129_vastavustingimused.pdf

297129.zip

Hankedokument_Alu torustik.docx

Hanke tehniline kirjeldus Lisa 1 Ehituse dokumentatsioon.xlsx

Hanke tehniline kirjeldus.pdf

Logstor Calculator Alu KKT uue trassi soojuskadude arvutus.pdf

Tööde teostamise graafik Alu torustik SW.xls

Töövõtuleping (torustiku ehitus) projekt Alu torustik.doc

Vorm III - Andmed kogemuse kohta Alu torustik.doc

Vorm I – Pakkuja kirjalik kinnitus hankemenetlusest kõrvaldamise aluste puudumise kohta Alu torustik.docx

Ready to get started?

Subscribe and enjoy all the benefits every day!