Rail Baltica Regional Passenger Rolling Stock Procurement AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Procurement Object Summary

  • What is being procured: Purchase of Rail Baltica regional passenger rolling stock together with associated services (TSSSA) and options for rolling stock units. The contracting authorities are Elron, LTG, and Vivi, who will sign separate contracts.
  • Main technical requirements:
    • Maximum operating speed: 200 km/h.
    • Climate class: T2 (-40 °C to +35 °C).
    • Floor height at doors: 760 mm ± 15 mm.
    • Safety systems: **ETCS Level…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

303788_ESPD_v2.0_laiendatud.xml

303788_hankepass_taiendavate_selgitustega.pdf

303788_hindamiskriteeriumid.pdf

303788_vastavustingimused.pdf

303788.zip

Annex 1 Technical Specification.zip

Annex 21 Contract (Elron).zip

Annex 22 Contract (LTG).zip

Annex 23 Contract (Vivi).zip

Annex 2 General Terms (ENG).docx

Annex 2 General Terms (EST).docx

Annex 3 Qualification form (ET+EN).docx

Annex 4 Power of Attorney (ET+EN).docx

Annex 5 Reliance on resources (ET+EN).docx

Annex 6 Requirements for key experts (ET+EN).docx

Annex 7 Expert CV form (ET+EN).docx

Annex 8 Cost and additional points form (EN).xlsx

Annex 9 Evaluation Methodology (ET+EN).docx

Instructions for tenderer (ET+EN).docx

Põhingimused-Main Terms_Elron.docx

Põhingimused-Main Terms_LTG.docx

Põhingimused-Main Terms_VIVI.docx

The_Milestone_plan_Elron.docx

The_Milestone_plan_LTG Link.docx

TS-A General Requirements/TS-A_General Requirements Version_A.docx

TS-A General Requirements/TS-A_General Requirements Version_A.xlsx

TS-B Requirements for Train Construction/TS-B_Train Constrution EMU Version_A.docx

TS-B Requirements for Train Construction/TS-B_Train Constrution EMU Version_A.xlsx

TS-C Infrastructure Requirements/Annex1_RBDL-SOD-ZZ-ZZ-DTB-R-00001_DALOP_EE_5.1.xlsx

TS-C Infrastructure Requirements/Annex2_RBDL-SOD-ZZ-ZZ-DTB-R-00002_DALOP_LV_5.0.xlsx

TS-C Infrastructure Requirements/TS-C_Infrastructure Requirements Version_A.docx

TS-C Infrastructure Requirements/TS-C_Infrastructure Requirements Version_A.xlsx

TS-D Requirements for Documentation/TS-D_Requirements for documentation Version_A.docx

TS-D Requirements for Documentation/TS-D_Requirements for documentation Version_A.xlsx

TS-E Requirements for Training/TS-E-Training-Version_A.docx

TS-E Requirements for Training/TS-E-Training-Version_A.xlsx

TS-F Requirements for ICT/TS-F_Requirements for ICT-Systems Version_A.docx

TS-F Requirements for ICT/TS-F_Requirements for ICT-Systems Version_A.xlsx

TS-H Requirements for Spare Parts/TS-H_Spare Parts Requirements A.docx

TS-H Requirements for Spare Parts/TS-H_Spare Parts Requirements A.xlsx

TS-K Conditions Related to Testing and Commissioning/TS-K_Requirements for Testing Version_A.docx.docx

TS-K Conditions Related to Testing and Commissioning/TS-K_Requirements for Testing Version_A.docx.xlsx

TS-L Lifecycle management/TS-L_Lifecycle management Version_A.docx

TS-L Lifecycle management/TS-L_Lifecycle management Version_A.xlsx

TSSSA Technical Support and Spares Supply Agreement 17 03 2026.docx

Ready to get started?

Subscribe and enjoy all the benefits every day!