Development of the concept and preparation of the main design for the Enefit-280 ash crushing and ash loading unit AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Object of Procurement

  • What is being procured: Development of the concept and preparation of the main design for the Enefit-280 ash crushing and ash loading unit.
  • Main technical requirements, characteristics:
    • Two parallel crushing lines.
    • Total mass throughput for each line: 100 t/h.
    • Throughput of fraction $>2$ mm for each line: $>30$ t/h.
    • Required particle size: $\le 2$ mm.
    • Maximum piece size: 80 mm.
    • Ash temperature: **$200^{\circ}\text{C}…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

306344_hindamiskriteeriumid.pdf

306344_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

306344_vastavustingimused.pdf

306344.zip

Eesti Energia kontserni partnerite eetikakoodeks (21112022).pdf

Eesti Energia TTO nouded.pdf

Juhised pakkujatele_Lihthange_14092022.pdf

Tehniline ülesanne_v3_10.03.2026/Technical Specification_10.03.2026_EN.docx

Tehniline ülesanne_v3_10.03.2026/Tehniline ülesanne_ET_10.03.2026.docx

Tehniline ülesanne_v3_10.03.2026/Tehniline ülesanne_RU_10.03.2026.docx

Tehniline ülesanne_v3_10032026.zip

Töövõtulepingu vorm koos lisadega.zip

TöövΣtulepingu üldtingimused.pdf

TöövΣtulepingu vorm.docx

Tutvumisvisiidi info_Site visit information.docx

Vastutuse jagamise kokkulepe.pdf

Vorm 1 Pakkumuse maksumuse vorm.xlsx

Vorm 2 Lepingute nimekiri.docx

Vorm 3 Tööde vastutatavate isikute pädevuste kinnitamine.docx

Ready to get started?

Subscribe and enjoy all the benefits every day!