Connection Point Construction 2026-2029 AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Object of the Procurement

  • What is being procured: Construction of connection points for public water supply and/or sewerage and/or rainwater drainage systems (Construction works).
  • Main technical requirements, characteristics:
    • The work must comply with AS Tallinna Vesi’s technical requirements (including water pipe disinfection requirements).
    • The work must comply with legislation and relevant standards.
    • The contractor must ensure compliance with occupational health, safety, and environmental requirements.
    • **The work does not…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

304845_alltoovotjate_kontrollimise_tingimused.pdf

304845_ESPD_v2.0_laiendatud.xml

304845_hankepass_taiendavate_selgitustega.pdf

304845_hindamiskriteeriumid.pdf

304845.zip

DHS dokument.docx

Lisa 1 Tehniline kirjeldus.docx

Lisa 2 Ostutellimuse vorm.docx

Lisa 3 Pakkumuse maksumuse vorm.xlsx

Lisa 4 Liitumispunkti ehituse üldtingimused.docx

Lisa 5 Töötervishoiu-, -ohutuse- ja keskkonnanõuded AS Tallinna Vesi (30012026).pdf

Lisa 6 Ühispakkujate volikiri.docx

Lisa 7 Teise ettevõtja nõusolek tema vahenditele tuginemiseks.docx

Lisa 8 Leppetrahvi määramise akti vorm.docx

Ready to get started?

Subscribe and enjoy all the benefits every day!