Reconstruction of water and sewage pipelines in the Sütiste inner quarter AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Object of Procurement

  • What is being procured: Reconstruction of water and sewage pipelines in the Sütiste inner quarter.
  • Main technical requirements, features:
    • Reconstruction of water supply and sewage networks simultaneously with district heating pipelines.
    • Elimination of water pipelines running through the basements of terraced apartment buildings and establishing an independent water connection for each apartment building.
    • PE pipes must comply with PE100 RC requirements.
    • The inner surface of…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

305451_alltoovotjate_kontrollimise_tingimused.pdf

305451_hindamiskriteeriumid.pdf

305451_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

305451_vastavustingimused.pdf

305451.zip

Lihthankemenetluse kord.docx

Lisa 1 Tehniline kirjeldus TVESI.docx

Lisa 2 Pakkumuse maksumuse vorm Sõpruse-Sütiste 2702.xlsx

Lisa 3 Töötervishoiu-, -ohutuse- ja keskkonnanõuded AS Tallinna Vesi (30012026).pdf

Lisa 5 Leppetrahvi määramise akti vorm.docx

Lisad 4, 6 ja 7.xlsx

Teise ettevõtja nõusolek tema vahenditele tuginemiseks (1) (1).docx

Toruehituse töövõtulepingu vorm 10092025.docx

Ühispakkujate volikiri .docx

Ready to get started?

Subscribe and enjoy all the benefits every day!