Construction of Rakke Niidu Boiler House AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Object of Procurement

  • What is being procured: Design and construction of the Rakke Niidu boiler house. This includes preparing the construction design for the boiler house and the associated pellet storage, carrying out construction works, supplying and installing equipment, and developing the automatic control system.
  • Main technical requirements, features:
    • The boiler house must be fully automatic, running on biofuel (point 1.1 Annex 1).
    • Boiler house operating period: August-May.
    • Heat…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

305421_hindamiskriteeriumid.pdf

305421_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

305421_vastavustingimused.pdf

305421.zip

Hankedokument_Rakke Niidu katlamaja.docx

Lisa 1 - Tehniline kirjeldus Rakke Niidu KM v2.pdf

Lisa 2 - KM asendiplaan v2.pdf

Lisa 3 - KM PID skeem.pdf

Lisa 4 - KM elekter.pdf

Lisa 5 - KM tulekustutusvesi.pdf

Lisa 5 Pakutavate seadmete nimekiri Rakke Niidu KM.xlsx

Lisa 6 maksumuse vorm Rakke Niidu KM.xlsx

PT_Niidu_konteinerkatlamaja.asice

Tööde teostamise graafik Rakke Niidu KM.xlsx

Töövõtuleping (katlamaja projekteerimine ja ehitamine) projekt Rakke Niidu KM.doc

Vorm I – Pakkuja kirjalik kinnitus hankemenetlusest kõrvaldamise aluste puudumise kohta Rakke Niidu KM.docx

Vorm IV - Ühispakkujate volikiri Rakke Niidu KM.docx

Ready to get started?

Subscribe and enjoy all the benefits every day!