Läätsa Substation Reconstruction AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Procurement Object

  • What is being procured: Preparation of the substation and main switchgear reconstruction project and execution of the reconstruction works on a “turnkey” basis (including equipment supply, installation, testing, and commissioning).
  • Main technical requirements, features:
    • The system must allow the simultaneous parallel use of two (2) 600 A transformers.
    • The rated current of the main switchgear must be at least 1000 A.
    • The distribution system must be **fully…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

305549_alltoovotjate_kontrollimise_tingimused.pdf

305549_hindamiskriteeriumid.pdf

305549_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

305549_vastavustingimused.pdf

305549.zip

Lähteülesanne.doc

Ready to get started?

Subscribe and enjoy all the benefits every day!