Kuiv Street Water Pipeline Construction Works AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Object of Procurement

  • What is being procured: Kuiv Street water pipeline construction works.
  • Main technical requirements, features:
    • The goal is to ensure the looping of the water network and improve water quality.
    • The total length of the constructed water pipeline is approx. 73m, of which approx. 56m (de63) will be constructed using trenchless methods.
    • The PE water pipeline material must comply with PE100 RC requirements.
    • The documentation related…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

304789_hindamiskriteeriumid.pdf

304789_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

304789_vastavustingimused.pdf

304789.zip

Lisa 3 Töötervishoiu-, -ohutuse- ja keskkonnanõuded AS Tallinna Vesi (11092025).pdf

Lisa 5 Leppetrahvi määramise akti vorm.docx

Lisad 4, 6 ja 7.xlsx

Pakkumuse maksumuse vorm_Kuiv tn.xlsx

Tehniline kirjeldus_Kuiv tn.docx

Teise ettevõtja nõusolek tema vahenditele tuginemiseks.docx

Toruehituse töövõtuleping_20012026.docx

Ühispakkujate volikiri.docx

Väikehanke_pakkumuse esitamise ettepanek.docx

Ready to get started?

Subscribe and enjoy all the benefits every day!