Lääne-Virumaa, Haljala 110/35/10kV substation 10kV supply reconstruction AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Procurement object

  • What is being procured: Reconstruction of the 10kV switchgear supply at the Lääne-Virumaa, Haljala 110/35/10kV substation. The goal is to energize the existing 10kV switchgear through Elering AS’s new C2T power transformer, including all necessary associated works.
  • Main technical requirements, characteristics: The type of procurement is Construction works. The procurement involves Conclusion of a supply contract.
  • Geographical scope or location of service provision: Place of execution is Estonia (EE001,…
     
    To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

304896_hindamiskriteeriumid.pdf

304896_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

304896_vastavustingimused.pdf

304896.zip

Hanke alusdokumendid/Eesti Energia kontserni partnerite eetikakoodeks (21.11.2022).pdf

Hanke alusdokumendid/EPP kasutusjuhend partneritele ver.4/EPP kasutajaks registreerimise vorm.xlsx

Hanke alusdokumendid/EPP kasutusjuhend partneritele ver.4/J3116 EPP kasutusjuhend partneritele ver.3(1).pdf

Hanke alusdokumendid/Oluline info hankes osalejale .docx

Hanke alusdokumendid/P1120 Elektrilevi infosüsteemide kasutamise tingimused ver.3/Lisa1-Kasutaja esindajad ja infosüsteemid.docx

Hanke alusdokumendid/P1120 Elektrilevi infosüsteemide kasutamise tingimused ver.3/Lisa-2_Nouded-arvutile-ja-kasutajale.docx

Hanke alusdokumendid/P1120 Elektrilevi infosüsteemide kasutamise tingimused ver.3/P1120 Elektrilevi infosüsteemide kasutamise lepingu tingimused, ver.3.pdf

Hanke alusdokumendid/Töötervishoiu ja tööohutuse nõuded Eesti Energia lepingupartneritele (2.11.2020).pdf

Hanke alusdokumendid/V113 Töövõtulepingu vorm (18.06.2025)/P1111 Isikuandmete töötlemise tingimused ver.5.pdf

Hanke alusdokumendid/V113 Töövõtulepingu vorm (18.06.2025)/P135 Elektripaigaldiste ehitustööde töövõtu tüüptingimused ver.23.pdf

Hanke alusdokumendid/V113 Töövõtulepingu vorm (18.06.2025)/V113 Töövõtulepingu vorm ver. 12 (17.12.2024).docx

Hanke alusdokumendid/Varasemate hankelepingute informatsioon.docx

Hanke alusdokumendid/Volikiri ühispakkuja esindamise kohta.docx

Hanke alusdokumendid.zip

Hanke maht ja nõuded Haljala AJ 10kV toite ümberehitus.pdf

Lisad (1).zip

Lisad/Lisa 1. Tööprojekt 468567. Connecto/DOC/468567_TP_EL-0-3-01_Seletuskiri.docx

Lisad/Lisa 1. Tööprojekt 468567. Connecto/DOC/468567_TP_EL-2-01_Kooskõlastuste koondtabel.docx

Lisad/Lisa 1. Tööprojekt 468567. Connecto/DOC/468567_TP_EL-4-01_Materjalide spetsifikatsioon.docx

Lisad/Lisa 1. Tööprojekt 468567. Connecto/Joonised/468567_TP_EL-7-01_Asendiplaan.dwg

Lisad/Lisa 1. Tööprojekt 468567. Connecto/Joonised/468567_TP_EL-7-01_Asendiplaan.pdf

Lisad/Lisa 1. Tööprojekt 468567. Connecto/Joonised/468567_TP_EL-7-02_Elektriskeem.dwg

Lisad/Lisa 1. Tööprojekt 468567. Connecto/Joonised/468567_TP_EL-7-02_Elektriskeem.pdf

Lisad/Lisa 1. Tööprojekt 468567. Connecto/Joonised/468567_TP_EL-7-03_Haljala 110_35_10kV.dwg

Lisad/Lisa 1. Tööprojekt 468567. Connecto/Joonised/468567_TP_EL-7-03_Haljala 110_35_10kV.dwl

Lisad/Lisa 1. Tööprojekt 468567. Connecto/Joonised/468567_TP_EL-7-03_Haljala 110_35_10kV.dwl2

Lisad/Lisa 1. Tööprojekt 468567. Connecto/Joonised/468567_TP_EL-7-03_Haljala 110_35_10kV.pdf

Lisad/Lisa 1. Tööprojekt 468567. Connecto/Joonised/plot.log

Lisad/Lisa 2. Sekundaarosa maht ja nõuded. Haljala AJ toite ümberehitus.pdf

Lisad/Lisa 3. Elering materjalid/Asendustrafo/20.08.12_C2T_ülevaatus_1.JPG

Lisad/Lisa 3. Elering materjalid/Asendustrafo/20.08.12_C2T_ülevaatus_3.JPG

Lisad/Lisa 3. Elering materjalid/Asendustrafo/20.08.12_C2T_ülevaatus_4.JPG

Lisad/Lisa 3. Elering materjalid/Asendustrafo/20.08.12_C2T_ülevaatus_6.JPG

Lisad/Lisa 3. Elering materjalid/Asendustrafo/Asendus TR_joonis.jpg

Lisad/Lisa 3. Elering materjalid/Asendustrafo/Asendus TR_sek osa joonised.pdf

Lisad/Lisa 3. Elering materjalid/Asendustrafo/C2T_silt_AL&ajam.JPG

Lisad/Lisa 3. Elering materjalid/Asendustrafo/C2T_silt.JPG

Lisad/Lisa 3. Elering materjalid/Haljala AJ primaarskeem HD ER_24_04_17 kaitsetega-A3 HD.pdf

Lisad/Lisa 3. Elering materjalid/Haljala ER ELV.pdf

Lisad/Lisa 3. Elering materjalid/Primaar/2402353_TP_EL-7-01_Primaarskeem_A3.pdf

Lisad/Lisa 3. Elering materjalid/Primaar/2402353_TP_EL-7-02-07_Plaanid.dwg

Lisad/Lisa 3. Elering materjalid/Primaar/2402353_TP_EL-7-02_Asendiplaan_A3.pdf

Lisad/Lisa 3. Elering materjalid/Primaar/2402353_TP_EL-7-04_Kaablikatisetorude plaan_A2.pdf

Lisad/Lisa 3. Elering materjalid/Primaar/2402353_TP_EL-7-08_Lõiked_A2.pdf

Lisad/Lisa 3. Elering materjalid/Primaar/2402353_TP_EL-7-08_Lõiked.dwg

Lisad/Lisa 4. Juhendid ja nõuded/J3106 Mittevajaliku vara ja tagastuvate elektriseadmete käsitlemine 211025.pdf

Lisad/Lisa 4. Juhendid ja nõuded/J374 Kaabli- ja muhvipaigaldaja kvalifikatsiooni tagamise juhend, ver.4.pdf

Lisad/Lisa 4. Juhendid ja nõuded/P135 Elektripaigaldiste ehitustööde töövõtu tüüptingimused ver.23.pdf

Lisad/Lisa 4. Juhendid ja nõuded/P346 Võrguvara tähistamise ja märgistamise nõuded ver.7.pdf

Lisad/Lisa 4. Juhendid ja nõuded/P378 Nouded plastisolatsiooniga keskpingekaablite jatku- ja otsamuhvidele ja nende kasutamisele, ver.6.pdf

Lisad/Lisa 5. Nõuded suurte projektide ehitusel üleantavale dokumentatsioonile/Lisa 1. Suurprojektide üleantava teostusdokumentatsiooni loetelu (21.11.2025).pdf

Lisad/Lisa 5. Nõuded suurte projektide ehitusel üleantavale dokumentatsioonile/Lisa 5. Nõuded suurte projektide ehitusel üleantavale dokumentatsioonile.pdf

Varasemate hankelepingute informatsioon 1062022.docx

Vorm 1 Hinnapakkumuse tabell.xlsx