Object of Procurement

  • What is being procured: Reconstruction of the 10 kV transformer switchgear at Nõva substation, Vaisi village, Lääne-Nigula municipality, Lääne county (Project code TC0307).
  • Main technical requirements, characteristics:
    • Construction of a new 10 kV underground cable line between C1T 10kV gantry and F1009 feeder (3x(Al 1x630mm²), L=69m).
    • Dismantling of the existing F1009 incoming line and coil switchgear.
    • Installation of current transformers (200-400A/5/5/5A) and surge arresters for transformer…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

10kV jaotla.jpg

304579_hindamiskriteeriumid.pdf

304579_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

304579_vastavustingimused.pdf

304579.zip

C1T ja F1009 vaheline ühendus (2).jpg

C1T ja F1009 vaheline ühendus (3).JPG

C1T ja F1009 vaheline ühendus.jpg

Eesti Energia kontserni partnerite eetikakoodeks (21.11.2022).pdf

EPP kasutajaks registreerimise vorm.xlsx

EPP kasutusjuhend partneritele ver.4.zip

F1009 (2).jpg

F1009 (3).jpg

F1009.jpg

J3116 EPP kasutusjuhend partneritele ver.4.pdf

Nõva AJ 10 kV trafo latistuse rekonstueerimise üldmaht.docx

Oluline info hankes osalejale VÄIKEHANGE (11.09.2025).docx

P1120 Elektrilevi infosüsteemide kasutamise tingimused ver.3/Lisa1-Kasutaja esindajad ja infosüsteemid.docx

P1120 Elektrilevi infosüsteemide kasutamise tingimused ver.3/Lisa-2_Nouded-arvutile-ja-kasutajale.docx

P1120 Elektrilevi infosüsteemide kasutamise tingimused ver.3/P1120 Elektrilevi infosüsteemide kasutamise lepingu tingimused, ver.3.pdf

Projekt/Elering AS 12-92025622.pdf

Projekt/TC0307_TP_EL-3-01_seletuskiri_2510021716.pdf

Projekt/TC0307_TP_EL_4-01_asendiplaan_2510021709.dwg

Projekt/TC0307_TP_EL_4-01_asendiplaan_2510021709.pdf

Projekt/TC0307_TP_EL-5-01_elektriskeem_2509301213.dwg

Projekt/TC0307_TP_EL-5-01_elektriskeem_2509301213.pdf

Projekt/TC0307_TP_ EL-8-01_spets_2510021708.pdf

Projekt/TC0307_TP_EL-9-01_TC0307 lähteülesanne_2507231739.docx

Projekt/TC0307_TP_EL-9-02_TC0307 lähteülesande asendiplaan_2507231739.pdf

Projekt/TC0307_TP_EL-9-03_C1T 10kV portaal_2510021723.dwg

Projekt/TC0307_TP_EL-9-04_fotod_2508111243.zip

Projekt/TC0307_TP_EL-9-06_k-koondtabel_2510162053.docx

Projekt/Töö mahtude tabel_2510311647.xls

Projekt.zip

Töötervishoiu ja tööohutuse nõuded Eesti Energia lepingupartneritele (2.11.2020).pdf

V113 Töövõtulepingu vorm (18.06.2025)/P1111 Isikuandmete töötlemise tingimused ver.5.pdf

V113 Töövõtulepingu vorm (18.06.2025)/P135 Elektripaigaldiste ehitustööde töövõtu tüüptingimused ver.23.pdf

V113 Töövõtulepingu vorm (18.06.2025)/V113 Töövõtulepingu vorm ver. 12 (17.12.2024).docx

V113 Töövõtulepingu vorm (18.06.2025).zip

Väikehanke alusdokumendid (02012026).zip

Varasemate hankelepingute informatsioon.docx

Varasemate hankelepingute informatsioon.docx

Volikiri ühispakkuja esindamise kohta.docx

Vorm 1 Hinnapakkumuse tabel Nõva.xlsx

Ready to get started?

Subscribe and enjoy all the benefits every day!