Blade bearing bolt replacement works for wind turbines in Pakri wind farm AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Object of Procurement

  • What is being procured: Replacement works for wind turbine blade bearing bolts in Pakri wind farm (Hub to blade interface bolts exchange).
  • Main technical requirements, characteristics:
    • The service includes bolt replacement in 7 Nordex N90 wind turbines (total of 21 blade bearings).
    • Both inner and outer bolts must be replaced in each blade bearing (except for WT3, WT7, where some bolts have already been replaced).
    • The…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

307851_hindamiskriteeriumid.pdf

307851_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf

307851_vastavustingimused.pdf

307851.zip

Draft contract/Draft contract.docx

Draft contract/Eesti Energia Group´s Code of Ethics for Partners.pdf

Draft contract/General terms and conditions of contracts for services.pdf

Draft contract/Occupational health and safety requirements for the contractual partners of Eesti Energia.pdf

Draft contract/Principles of processing the personal data of Eesti Energia Groups partners.pdf

Draft contract.zip

Technical description/Appendix 1. Hub to blade interface bolts exchange instruction.xlsx

Technical description/Appendix 2. Pakri wind park site plan.pdf

Technical description/Technical description.docx

Technical description.zip

Tender price.xlsx

Ready to get started?

Subscribe and enjoy all the benefits every day!