Optimization of the Liquid Nitrogen System with Installation Works (Public Inquiry) AI
Expired
Survey announced
45231112 - Installation of pipe system
TEDAS your procurement assistant
Ask a question about this procurement
t
Subject of Procurement
Procured: Works \u2013 Optimization of the liquid nitrogen system with installation works.
Main technical requirements, features:
Installation of a liquid nitrogen tank connection-control panel (two-connection with shut-off valve, outdoor version).
Laying of a vacuum pipe (hose) to the designated manifold.
Installation of a stainless steel manifold (AISI 304L or 316L grade or equivalent) with 8 connections, a pressure gauge, welded ends, and spherical blind flanges.
*…