DESIGN AND CONSTRUCTION OF A 2.2 MW BIOMASS WATER HEATING BOILER IN RUKLA RK AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Subject of Procurement

  • Procured item: Design and construction of a 2.2 MW biomass water heating boiler in the Rukla boiler house, including all associated equipment (fuel storage, boiler with furnace, flue gas cleaning equipment, Economizer (DKE), chimney, ash removal system, water/electrical/automation systems) and simple repair works.
  • Main technical requirements, specifics:
    • Boiler power: Design (nominal) 2.2 MW.
    • Boiler efficiency (NVK): Not less than 86% across the entire load range (25–100%).
      *…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

5 priedas espd-request (4).zip

Atviro konkurso bendrosios 11-25 paskelbimui (4)(3).docx

Atviro konkurso specialiosios CVPIS.docx

c4t_6214415_1.xml

espd-request.pdf

espd-request.xml

informacija dėl pasiūlymų pateikimo termino.docx

pasiūlymo 1 priedas_deklaracija CVPIS.docx

pirkimo dalyviams.doc

pirkimo dokumentai.zip

Pirkimo sąlygų 6 priedas Pasiūlymo forma CVPIS.docx

README.txt

Sutarties projektas CVPIS.docx

Techninė specifikacija CVPIS.docx

TS priedas 1 Žemės sklypo planas Ruklio g. 6.pdf

TS priedas 2 Statinio planas Ruklio g 6.pdf

TS priedas 3 El. tinklų ribų aktas.pdf

TS priedas 4 2025-2026 temper grafikas.pdf

Ready to get started?

Subscribe and enjoy all the benefits every day!