Market consultation regarding the procurement for the preparation of the Technical Design for the Stormwater Drainage System and Supervision of Project Implementation at the site: "Construction of the tunnel passage at km 10.127, traffic interchange, under the A2 Vilnius-Panevėžys highway, and reconstruction of the A2 Vilnius–Panevėžys highway from Nesvyžius St. km 9.276 to the exit to the tunnel viaduct km 9.912, with the installation of a 3rd traffic lane, and supervision of the project implementation" AI

TEDAS your procurement assistant

Ask a question about this procurement

t

Subject of Procurement

  • Services: Preparation of the Technical Design for the Stormwater Drainage System and Supervision of Project Implementation.
  • Main Technical Requirements, Specifics:
    • The project covers two geographical parts: a part in Vilnius city and a part in Vilnius district.
    • Vilnius City Part: Design an accumulation tank, a pumping station, and a pressure pipeline for diverting rainwater from the tunnel passage. Connect the existing drainage system of the connecting road…
       
      To see full summary, please log in or register.
t

👋 Hello! I am TEDAS – your procurement assistant 💼✨

What would you like to know about this procurement?

Note: This is preliminary information. For accuracy, please review all procurement documents.
Ask your questions here...

1 Priedas_TS.zip

2 Priedas_Klausimynas_A2.docx

3 Priedas_Kvalifikaciniai reikalavimai_A2.docx

Kvietimas rinkos konsultacijai.docx

TS/Schema Nr_1.pdf

TS/Schema Nr_2.pdf

TS/Techninės specifikacijos.docx

Ready to get started?

Subscribe and enjoy all the benefits every day!